Development capacity studies for New York City. Zoning, envelope and capacity for any covered lot.
Method

Built on the rules, with the working shown.

Plot is a set of written rules and geometry, run on the city's open data. It draws by rule. Each step below writes its figures with their source, so a reader can follow any number back to a section of the Zoning Resolution or a dataset.

01
The lot

The tax lots you pick are read from MapPLUTO with their polygons, the buildings on them and next to them, the streets and their widths, and the zoning lot records in ACRIS.

02
The zoning

The district, overlay and special district come from the zoning layers. The rules come from the engine's rule table, where each value carries the section of the Zoning Resolution it was read from.

03
The envelope

Front, side and rear yards, setbacks, heights and lot coverage are cut from the lot polygon. The result is the volume the zoning permits, floor by floor.

04
The estimate

A plate model fills the envelope with floors of practical depth and sizes the apartments against recent filings in the district. In a house district the answer is the house.

05
The drawn building

Where a corner, bar or small lot type fits, the plan module places cores, corridors and furnished apartments, then checks the result against zoning, the Building Code and the HPD Design Guidelines 2026.

06
The review

Before a study is shown, a review checks the files against each other: the report, the plans, the model and the schedule have to agree.

Coverage

82.1% of the city's tax lots, and growing.

The engine reads a lot when its district is in the rule table. The table grows district by district, and each addition is checked against every tax lot in the city. Counted against MapPLUTO on 25 November 2026.

Read by the engine704,76182.1%
Special district103,46812.1%
Split lot, two districts or more19,7142.3%
Manufacturing district19,4162.3%
Commercial district not in the table5,9430.7%
Park or no district4,1250.5%
Principles

Four rules the engine keeps.

01
Every number carries its source

A section of the Zoning Resolution, a dataset with its vintage, or the label allowance where it is an assumption.

02
Rules are read, then read again

Each district row in the rule table is taken from the text of the Zoning Resolution in two separate passes before it is used.

03
Checked before it leaves

Every drawn building passes its checks against zoning and code and sits inside the lot and the envelope before you see it.

04
Growing district by district

82 percent of the city's tax lots are read today. Special districts, split lots and manufacturing districts are next in line.

Sources

Public data, dated.

MapPLUTOTax lots, owners, existing buildings
Zoning ResolutionDistrict rules, read from the text twice
Building FootprintsWhat stands on the lot and next to it
ACRISZoning lot records
DOB filingsWhat was filed nearby, for sizing and for the check
Census ACSLocation and market context
From study to filing

Your team takes it from here.

A surveyorconfirms the lot lines, the lot area and the street widths
A title companyconfirms the zoning lot, easements, declarations and restrictions
An expediterconfirms the reading of the zoning, and every value marked to verify
A licensed architectconfirms the building, its code compliance and its egress

See it on a lot.

Open the map